Scope¶
This guide is for the integrator of a Safety Element out of Context (SEooC):
you integrate a reusable component into a product/system with specific context
you assign domain-specific integrity levels and complete the safety case
For a full CLI command/option reference, see CLI Reference.
OSQAr helps you verify and intake auditable evidence shipments (and keep the traceability chain consistent), but it does not replace system engineering or certification.
Integrator responsibilities (checklist)¶
Assumptions and context¶
Define the intended use and operational context.
Identify supplier assumptions; validate them in your system.
Hazard analysis and integrity assignment¶
Perform domain-appropriate hazard analysis (HARA/HAZOP/FMEA as applicable).
Assign integrity levels (ASIL/SIL/PL or equivalent) in context.
Derive system-level safety goals and requirements.
Interface and configuration control¶
Define interface contracts (signals, timing, units, error behavior).
Freeze and change-control safety-relevant parameters.
Verification strategy¶
Ensure each safety requirement is verified by at least one method:
analysis
review/inspection
test (unit, integration, system)
Extend verification beyond unit tests:
integration tests (interfaces, timing, fault handling)
environmental tests (noise profiles, operating extremes)
fault injection (if required by integrity level)
Evidence packaging¶
Archive evidence that an assessor can reproduce:
rendered HTML documentation
requirement and traceability artifacts
test results (e.g., JUnit XML)
tool versions and environment description
Integrity verification of a supplier shipment¶
Treat each example build output directory you receive from a supplier as a controlled software shipment.
The supplier should provide a checksum manifest file SHA256SUMS at the root of that shipment.
Recommended integrator procedure¶
Unpack the shipment into a controlled location.
Verify the checksum manifest using the OSQAr checksum tool:
osqar checksum verify \ --root /path/to/shipment \ --manifest /path/to/shipment/SHA256SUMS
Recommended integrator one-shot workflow (CLI):
osqar shipment verify \ --shipment /path/to/shipment \ --traceability \ --json-report /path/to/shipment/traceability_report.integrator.json \ --report-json /path/to/shipment/verify_report.json Optional extensions: - Use ``--verify-command '<cmd>'`` (repeatable) to run additional integrator-side checks after OSQAr’s built-in verification. - Use ``--config-root <dir>`` / ``--config <path>`` to load a trusted integrator workspace config (``osqar_workspace.json``). - Disable hooks via ``--no-hooks`` or by setting ``OSQAR_DISABLE_HOOKS=1``.If verification reports
missingormismatchedfiles, treat the shipment as corrupted or tampered with, and re-transfer the artifact.Do not regenerate
SHA256SUMSon the receiver side as a substitute for verification.
Verify traceability artifacts (machine-readable) as part of intake:
needs.json: the exported traceability graphtraceability_report.json: the supplier’s check result
You can re-run the checks locally to confirm the shipment content passes your intake gate:
osqar traceability /path/to/shipment/needs.json \ --json-report /path/to/shipment/traceability_report.integrator.json
Store your integrator-side report alongside the shipped evidence.
Multi-shipment intake (recommended)¶
If you routinely integrate multiple supplier projects, archive them using the workspace intake command. This produces a single dated intake folder with a Subproject overview summary file:
osqar workspace intake \
--root intake/received \
--recursive \
--output intake/archive/2026-02-01 \
--traceability
If supplier shipments declare dependencies (in shipped osqar_project.json), enforce dependency closure during
verification/intake:
osqar workspace verify --root intake/received --recursive --enforce-deps
With --enforce-deps, OSQAr fails the command if dependencies are missing, ambiguous, or conflicting in the workspace.
For details on dependency pins and deduplication, see Multi-project workflows.
For a quick, non-copying inventory of received shipments, you can also use:
osqar workspace report --root intake/received --recursive --output intake/overview --open
How to tailor the reference example¶
Copy the chapter structure and replace content with system-specific artifacts.
Add integration requirements and link them into the chain (REQ ↔ ARCH ↔ TEST).
Add system diagrams showing the SEooC boundary and external dependencies.
Add integration/system
TEST_*needs and link them to affected requirements.
Review questions¶
Which assumptions are safety-relevant, and how are they validated?
Are safety-related configuration values protected and change-controlled?
Do timing budgets hold under worst-case conditions?
Is traceability complete and bidirectional (REQ ↔ ARCH ↔ TEST)?